7 - PRE-DELIVERY CHECKLIST
To the dealer: Inspect the machine thoroughly after assembly to assure it is
functioning properly before delivering it to the customer. The following checklist
is a reminder of points to cover. Check off each item as it is found satisfactory or
after proper adjustment is made.
Guards and shield properly fastened.
Lubrication of grease fittings.
All hardware properly tightened.
All decals properly located and readable
(see fig. 2)
.
Tines properly installed, bolts and nuts tightened.
Overall condition (touch up scratches, clean and polish).
Test run, check for excessive vibration or overheating of bearings.
Operator’s Manual.
Review the Operator’s Manual with the customer. Explain the following:
Warranty.
Safe operation and service.
Correct machine installation and operation.
Daily and periodic lubrication, maintenance and inspections.
Troubleshooting.
Operational procedures and storage.
Parts and service.
Fill out the Pre-Delivery Checklist and Warranty Registration form.
Give customer the Operator’s Manual and encourage the customer to read the
manual carefully.
IMPORTANT: Warranty is not valid unless Pre-Delivery Checklist and Warranty
Registration form in Operator’s Manual is completed in detail and mailed to the
Company.
Model Number: __________
Serial Number: __________
Delivery Date: __________
Dealer’s Signature: __________
P
RE
-D
ELIVERY
C
HECKLIST
28
BEFCO
H
AY
R
AKES
O
PERATOR
’
S
M
ANUAL
Summary of Contents for RS2-04L
Page 36: ...HAY RAKES FRAME OPERATOR S MANUAL RS2 04 PARTS MANUAL 36 BEFCO 08 2013...
Page 38: ...HAY RAKES FRAME OPERATOR S MANUAL RS2 05 PARTS MANUAL 38 BEFCO 08 2013...
Page 40: ...HAY RAKES FRAME OPERATOR S MANUAL RS2 06 PARTS MANUAL 40 BEFCO 12 2013...
Page 44: ...HAY RAKES DECALS OPERATOR S MANUAL RS2 04 RS2 05 RS2 06 PARTS MANUAL 44 BEFCO 08 2013...
Page 46: ......