Installation
5. Connect the cables in the specified order, according to the drawing and steps
below.
Caution:
•
The operator panel must be brought to ambient temperature before it is started
up. If condensation forms, ensure that the operator panel is dry before connecting
it to the power outlet.
•
Ensure that the operator panel and the controller system have the same electrical
grounding (reference voltage level), otherwise errors in communication may
occur.
•
Ensure that the voltage and polarity of the power source is correct.
•
Separate high voltage cables from signal and supply cables.
•
Shielded communication cables are recommended.
24V DC
RS232/
RS422/
RS485
24V DC
A
D
Controller
Power
B
Ethernet
C
–
Use 14–20 AWG (2.08–0.52 mm
2
) wire for the power connections.
–
Connect cable A.
–
Connect cable B, using the provided M5 steel screw with zinc plating
and a grounding conductor (as short as possible), that is sized correctly
according to local electrical codes.
–
Connect cable C.
–
Connect cable D.
6. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
2.2.1
Connections to the Controller
For information about the cables to be used when connecting the operator panel to
the controller, please refer to the help file for the driver in question.
Beijer Electronics, MAEN166
10