Beijing TT Aviation Technology Co., Ltd.
Add: No.1 TTA Building, Niantou Industrial Park ,Changping District,Beijing, China
www.ttaviation.org
52
4) Input the output percentage of pump
5) Click “Start”, then APP will prompt the flowmeter to start calibration successfully
6) After the calibration is completed, the APP voice will prompt the flowmeter
calibration successfully.
Volume of added water
Pump output percentage
Start calibration successfully