Setup
76
Operating Instructions 1225-6 - 01.0 - 01/2021
7.6
Assembling the throw-over stacker
Fig. 31: Assembling the throw-over stacker (1)
To assemble the throw-over stacker:
1.
Move the throw-over stacker with bracket (2) up to the
machine.
2.
Tighten the bracket (2) to the machine using the screws (1).
Do not yet tighten the screws (1) all the way.
(1) - Screws
(2) - Bracket
(3) - Compressed air line
(4) - Grounding wire
(5) - Compressed air line
③
④
⑤
①
②
Summary of Contents for 1225-6
Page 1: ...1225 6 Operating Instructions ...
Page 6: ...Table of Contents 4 Operating Instructions 1225 6 01 0 01 2021 ...
Page 16: ...Safety 14 Operating Instructions 1225 6 01 0 01 2021 ...
Page 20: ...Machine description 18 Operating Instructions 1225 6 01 0 01 2021 ...
Page 62: ...Programming 60 Operating Instructions 1225 6 01 0 01 2021 ...
Page 72: ...Maintenance 70 Operating Instructions 1225 6 01 0 01 2021 ...
Page 86: ...Decommissioning 84 Operating Instructions 1225 6 01 0 01 2021 ...
Page 88: ...Disposal 86 Operating Instructions 1225 6 01 0 01 2021 ...
Page 94: ...Technical data 92 Operating Instructions 1225 6 01 0 01 2021 ...
Page 95: ......