Auspacken und Montieren
4. Installation
Dear Customer,
Please check your electrical installation according to the applicable VDE
regulations 0100 and 0750, or check with the applicable regulations in your
country before operating our equipment.
As the operator of this system, you need to have the functionality of the fault
current circuit breaker checked regularly. Please ask your electrician.
These checks are necessary for the safety of your patients and for your own
safety.
This device is not approved for operation in potentially explosive atmospheres.
Maintenance of the unit must be carried out only by us or by a party expressly
authorized by us, otherwise the warranty shall lapse.
The connection of the AVERO Premium Plus must be done in accordance with the
technical drawings of BEKA Hospitec and the guidelines for the establishment of
wet areas and the current standards in force in your country.
All inlet and outlet hoses and electrical cables must be arranged so that there is no
risk of tripping.
Before installing the tub, the power cables must be adequately rinsed.
Before commissioning the thermostatic mixer must be set by a suitable
person.