Installation
Operating manual CARLO Alu 230
V2.7 E
Page 14 of 56
6 Installation
The product is supplied ready for use.
6.1 Electrical connection
Before you start to use our products, your electrical installation must be checked in
accordance with the relevant VDE-regulations 0100 and 0100-710.
This requirement is only applicable in Germany.
In other countries, other requirements might be applicable.
Ask a qualified electrician to install the wall charging unit in accordance with the
regulations applicable in your country.
The CARLO Alu is equipped with a 24V-battery system. A power connection, which is
compliant to the VDE regulations, is required for the charger cable as well as the wall
charging unit. In operation, the CARLO Alu is mains-independent.
6.2 First start-up
WARNING
The equipment is to be used exclusively in accordance with
the accompanying documents.
Only when these conditions are met, the manufacturer
considers himself responsible for the impact on the safety, the
reliability and the function of the device.
In the event of a new connection of the product, the technical
data must be observed.
NOTE:
The battery must be completely charged prior to the first use
of the CARLO Alu
(charging time approx. 4 hours).
Please check that the emergency stop switch is released prior
to moving the spreader bar.
The product is equipped with a 24V-electrical motor. This motor is self-locking and
therefore protected against unintentional lowering of the spreader bar in case of
malfunction or failure. The battery of the CARLO Alu must be completely charged
before starting to use the device.
Please check that the emergency stop switch is released (unlatched). To unlatch, turn
the emergency stop switch clockwise until it releases.