Installation
Operating manual NORA Alu
V2.13 E
Page 12 of 52
6 Installation
The product is supplied ready for use.
6.1 Electrical connection
Before you start using our products, your electrical installation must be checked in
accordance with the relevant VDE-regulations 0100 and 0100-710.
This requirement is only applicable in Germany. In other countries, other requirements
might be applicable.
Ask a qualified electrician to install the wall charging unit in accordance with the
regulations applicable in your country.
The socket must meet the requirements of VDE 0100 and 0100-710.
6.2 First start-up
WARNING
The equipment is to be used exclusively in accordance with the
accompanying documents.
Only when these conditions are met, the manufacturer considers
himself responsible for the impact on the safety, the reliability and
the function of the device.
In the event of a newly connected product, the technical data must
be observed.
NOTE:
The battery must be completely charged prior to the first use of
the NORA (charging time approx. 4 hours).
Please check that the emergency stop switch is released prior
to moving the spreader bar.
The NORA Alu standing and raising aid is equipped with a 24V-electrical motor. This
motor is self-locking and therefore protected against unintentional lowering of the
spreader bar in case of malfunction or failure. The battery of the NORA must be
completely charged before starting to use the device.
Please check that the emergency stop switch is released (unlatched). To unlatch, turn
the emergency stop switch clockwise until it releases.
The emergency stop switch is released by turning the button to the right (i.e.
clockwise).