Control and maintenance
BEKOMAT® 33U / 33U CO
25
Installation of the control unit on the BEKOMAT:
1.
Check whether or not the service unit (9) goes
with the control unit (1) (model designation and
colour of the arresting hook).
2.
Check whether or not the sealing mat (8) and
the contact springs (28) are clean, dry, and free
from impurities.
3.
Introduce the sensor (5) into the service unit (9).
4.
Hang the hook (29) of the control unit (1) in the
service unit (9).
5.
Press the control unit (1) against the service
unit (9) and snap into place.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
• Leak test of the screwed connector of the con-
densate receiver tank and of the connection of
this tank to the service unit
• Check of the electrical connections
• Check of the correct engagement of the control
unit
Pos: 70 / - -- - Seit enum br uch - -- - @0\ m od_1157028099015_ 0. docx @ 2903 @ @ 1