48 / 120 EN
Split-type room air conditioner / Installation Manual
9.1 Electrical safety checks
After installation, confirm that all electrical wiring is installed in accordance with local and national
regulations, and according to the Installation Manual.
Before test run
Check Grounding Work
Measure grounding resistance by visual detection and with grounding resistance tester. Grounding
resistance must be less than 4.
Note: This may not be required for some locations in the US.
During test run
Check for Electrical Leakage
During the Test Run, use an electroprobe and multimeter to perform a comprehensive electrical
leakage test.
If electrical leakage is detected, turn off the unit immediately and call a licensed electrician to find and
resolve the cause of the leakage.
Note: This may not be required for some locations in the US.
A
Warning for electric shock
All wiring must comply with local and national electrical
codes, and must be installed by a licensed electrician.
9
Electrical and gas leak checks
Summary of Contents for BEVPI 090
Page 118: ......
Page 119: ......
Page 120: ...www beko com ...
Page 121: ...Air conditioner remote control User Manual EN ...
Page 128: ...8 24 EN Air conditioner remote control User Manual 3 Handling the remote control ...
Page 142: ......
Page 143: ......
Page 144: ...www beko com ...
Page 145: ......
Page 166: ......
Page 167: ......
Page 168: ...www beko com ...