Safety instructions
CLEARPOINT® L 205 – L295 V
11
Danger!
Incorrect start-up!
The incorrect start-up of the CLEARPOINT
®
V may endanger persons.
Prior to starting up the CLEARPOINT
®
V, it must be ensured that the operating staff are
instructed according to these instructions for installation and operation with regard to the set-
up, monitoring, operation and maintenance of the plant, as well as to the safety measures to
be observed.
CAUTION
!
Operational reliability at risk!
Overloading the CLEARPOINT
®
V can compromise the operational reliability!
Observe the permissible temperature range!
Do not exceed the permissible volume flow!
NOTE
!
Operational reliability at risk!
Incorrect installation can compromise the operational reliability and affect service measures.
The clear diameter of the pipe joint must be at least as large as the mounting dimension of
the CLEARPOINT
®
V.
It is strongly recommended to install a shut-off valve both upstream and downstream of the
CLEARPOINT
®
V for the implementation of service measures.
To maintain the supply of compressed air during service failures, maintenance and repair
works on the CLEARPOINT
®
V, the installation of a bypass line around the CLEARPOINT
®
V
is advisable. This bypass line must have a shut-off valve.
Danger!
Mishandling!
Mishandling of the CLEARPOINT
®
V may endanger persons.
Prior to starting up the CLEARPOINT
®
V, it must be ensured that the operating staff are
instructed according to these instructions for installation and operation with regard to the set-
up, monitoring, operation and maintenance of the plant, as well as to the safety measures to
be observed.