EN
Installation and operation manual
DRYPOINT
®
M eco control
31
4. Loosen the fixing screws towards the head of the
membrane dryer using an Allen key.
Ø = 4 mm
M = 2,5 Nm + 0,5 %
5. Lift the control unit.
6. Unscrew the screws from the hood of the new control
unit using an Allen key.
Ø = 2 mm
M = 0,6 Nm + 10 %
7. Open the cover of the control unit carefully to the back.
Route the ribbon cable to the left out of the cable run.