Installation
30
METPOINT
®
OCV
Mounting of the stationary seal ring and of the screw-connection body (steps 7 – 8)
7. Please place the stationary seal ring (6) on the
mounting point on the already-installed
measuring section.
8. Now screw the screw-connection body (5),
unfastened in step 6, into the thread at the
measuring section. Make sure not to damage
the stationary seal ring when doing so.
Removal of the probe closure (step
9)
9. Please remove the closing plug (V) with the
second stationary seal ring with a suitable
hollow hexagon wrench.
Connection of the probe with the sensor unit and mounting of the stationary seal ring (step 10)
10. Connect the probe (3) with the sensor unit (1).
Please make sure not to damage the second
stationary seal ring (6) when doing so.
Summary of Contents for METPOINT OCV
Page 66: ...Declaration of conformity 66 METPOINT OCV 14 Declaration of conformity ...
Page 73: ......
Page 74: ......
Page 75: ......