FLIPPING™ ARCH
1MANUL027
Belanger®, Inc. *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
19
Installation
Optional Rain Bar Installation
1. Locate the Rain Bar, the Pipe Plug and the Hose Barb Fitting. See the image below.
Install the Pipe Plug and Hose Barb Fitting as shown below.
Note:
The Hose Barb Fitting MUST be on the same side as the Main Feed fitting.
2. Locate two Mounting Channel Weldments, two sets of Half Clamps and accompanying
hardware. See the images below.
Attach the Mounting Channel Wedments and the Half Clamps to the Head Assembly as
shown in the image below.
Rain Bar
Apply Teflon™ Tape and
Liquid Teflon™ to the
Threads at Installation
Pipe Plug
Apply Teflon™ Tape and
Liquid Teflon™ to the
Threads at Installation
Hose Barb Fitting
1/2" Flat Washer
(8)
1/2" Lock Washers (8)
Head
Assembly
Half Clamp
Mounting Channel
Weldments (2)