INSTALLATION AND STARTUP
1MANUL220
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
4-57
Chapter 4 Frame and Carriage Assembly
Optional On-Board Wheel Cleaner
Connections for Utilities and Internal Plumbing
Note:
If the multi-stage centrifugal pump was supplied by Belanger®, follow the steps below. If it was
field supplied, the utility supply lines MUST match your pump output requirements.
1)
Locate the supplied 1-
1/4” hose.
2)
Feed the hose through the boom.
Note:
It is important that the 1-1/4” hose be run on the entrance side of the boom. This assures the greatest
bending radius during operation. Be sure there is enough slack at the bend of the boom and on the
side of the FreeStyler® as stated earlier in Routing Boom Utilities in this chapter.
3)
Attach the 1-1/4
” hose to the Internal manifolds barbed hose fitting and secure it with a worm gear clamp.
4)
Verify that the 1-
1/4” hose has enough slack to allow for smooth operation.
5)
Wire-tie the 1-
1/4” hose securely within the boom as stated
earlier in Routing Boom Utilities in this chapter.
6)
From the supply side of the boom, measure the remaining length of hose required to reach from the utility boom to
the field supplied line.
Note:
If the supplied 1-1/4” water-hose is not long enough (33ft. supplied by Belanger®) and it is
necessary to purchase a longer hose from the field, the specifications are as follows:
500PSI
8” Bend Radius (minimum)
Additional hose can be purchased by the foot from Belanger® as part
#1HOSE820
7)
Cut 1 1/4” hose to the measured length.
DO NOT throw the remaining hose away
.
8)
Attach and Secure the 1-
1/4” hose to the field supplied line.
Note:
The difference in set-up from location to location requires that a link or field supplied line be the
responsibility of the owner. 1-1/2” Type M Copper is the suggested material of the field supplied
line.
Setting up the Pumping Station
1)
Remove the pumping station unit from its packing crate and position the pumping station into approximate location.
2)
Verify that the remaining 1-
1/4” hose is long enough to reach from the pump lo
cation to the field supplied line.
3)
Once it is in its permanent location, lag the pumping station to the floor.
4)
Attach and secure the remaining 1-
1/4” hose between the 1
-
1/4” barb ho
se fitting on the pumping station and the
field supplied line.
5)
Attach and
secure a 3/4” supply line to the barb hose fitting found below the tank on the inlet side of the solenoid
valve.
Type M Copper
1-1/4" (31.8 mm) 1-1/2" (38.1 mm)
2" (50.8 mm)
40 GPM
1.15/.079
0.51/.035
N/A
PSI per 10 foot of pipe/BAR per 3 meters of pipe
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......