INSTALLATION AND STARTUP
4-6
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 4 Frame and Carriage Assembly
Floor Mounted Frame
15) Slide the legs and corner clamps out to the end of the head beam or wall, whichever comes first,
and tighten the fasteners.
16) Measure the distance from the closest wall to the bottom of the leg on the entrance and exit side
of the machine
Set an equal distance on both ends.
Note:
In a large building, the machine should be centered to the door if possible.
Note:
In a small building, the legs can be set right up against the wall if necessary. The
corner clamps are located in their final position when the frame is in the air.
17)
Using the supplied 5/8” lag bolts (1FSTNR-ST750), secure the frame to the floor at all 4 corners.
Note:
If the rails are set at the 92-1/4’’ spacing, the rail is completely erected except the
rail travel stops.
Note:
If the spacing is 100’’, the driver side head beam clamps should be loosened to where
the lock washers are not fully compressed, and the rail travel stops need to be
clamped on.
18) Verify that the Head Beams and rails at the center of each span is level to compensate for possible
sagging of the rails.
Determine the lowest corner that has the required 133” distance from the under-side of the
Head Beam to the floor.
19) Raise the other 3 corners to level the Head Beams and rails.
Note:
Leveling is CRITICAL for proper machine operation!
Note:
After this point, the forklifts are no longer necessary and leveling also becomes far
more difficult without the forklifts.
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......