INSTALLATION AND STARTUP
1MANUL220
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1-7
Chapter 1 Introduction
Scope of This Manual
This Introduction Section is intended to:
•
Address the installation portion only.
•
Help you to understand how the installation manual is organized.
•
Encourage planning and organization.
•
Address safety issues.
Installation Manual
This is the manual that covers the installation portion of a
FreeStyler®
system. In this manual there is very little content
as to operation, maintenance, troubleshooting and so on. For those items please reference the FreeStyler®
Maintenance manual and any other supplied support documents.
How the Manual is Organized
The installation manual starts off with a "punch list" of activities that must be performed during the installation phase.
The list is comprehensive and provides a general order in which the tasks should be completed to minimize installation
time.
This list also acts as a directory for the remainder of the manual. Now is a good time to review the Recommended
Installation Sequence checklist in chapter 2.
The last section of the installation manual is concerned with initial startup. A checklist format is provided as a walk-
through of starting up and fine tuning the
FreeStyler®
system.
Planning and Organization
The installation manual assumes that your Belanger® Representative has already visited the site, taken measurements,
and quite possibly sent drawings showing equipment locations. The installation manual also assumes that all these
items have been thoroughly reviewed by the site General Contractor and Owner. If that is not the case, now is the time
to do so. For your convenience, the "Getting Started" section reiterates some of the critical points of a
FreeStyler®
installation. Primarily, the “Getting Started” section addresses equipment placement and electrical considerations
to
ensure the
FreeStyler®
system is installed successfully. If there is a planning question not covered in this manual,
please contact your Belanger® Representative immediately.
Ensure a Safe Work Environment
The job site can be a hectic place. Often deadlines control the pace. Please always keep in mind Job Site Safety. Proper
use of all safety gear (safety glasses, hard-hats, footwear, shields, guards, etc.) is imperative. Be aware of electrical
concerns (exposed conductors, extension cords, proximity to water, power tool maintenance, etc.). Be sure to obey
OSHA Lockout/Tagout procedures (Refer to 29 CFR 1910.147 and the example in 29 CFR 1910.147 Appendix A) and
that everyone on site understands this process. Rigging (forklift operation) is another concern. Minimize slip, trip, and
fall potentials consistently. In short, be aware of OSHA considerations, in addition to rules and regulations put in place
by your local authorities.
It is imperative to your safety and the safety of others to always follow safe work
procedures.
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......