INSTALLATION AND STARTUP
1MANUL220
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
2-1
Chapter 2 Recommended Installation Sequence Checklist
Become Familiar with Site
Building dimensions:
Backroom dimension
•
Bay area dimension
Location of:
Main water feed
Main Electrical feed
Determine proper location:
Air Drops
Wall Penetrations
E-Stops
Required Material:
•
Anticipate runs and material
required to complete install
(i.e., salt for softener,
hydraulic hose assemblies)
Main Installation Checklist
Item
Installation Task
Chapter Name
Chapter and/or
Page Number(s)
1
DETERMINE EQUIPMENT LOCATIONS
1.a
Mount MCC and SCC Controller
Electrical & Initial Startup
20 & 22
1.b
Mount Chemical Pumps
Chemical Delivery & MixStir® Options
7 & 8
1.c
Position RO Unit and Tank
Spot Free Rinse (RO)
18
1.d
Mount Dryer Panel
Electrical & Initial Startup
20 & 22
1.e
Mount HMI (E-1063 Human Machine Interface) or E-1063
Electrical & Initial Startup
20 & 22
1.f
Air compressor
NA
OPTIONAL ITEMS
1.g
Signage
Optional Signage
16
1.h
MixStir® for Chemical Delivery
MixStir® Options
8
1.i
Onboard Dryer
Optional Onboard Dryer
17
1.j
Reclaim Water Option
Reclaim Water Option
9
1.k
Booster Pump
Booster Pump Assembly
10
1.l
Wheel Cleaning and CTA
Wheel Cleaning and CTA Options
15
1.m
HydroBlade®
HydroBlade® Assembly
14
1.n
Bug Spray
Optional Bug Spray Applicator
11
1.o
Position Pumping Station
HydroBlade® Assembly
14
1.h
Reclaim modifications to Pumping station (if applicable)
Reclaim Water Option
9
2
MEET WITH ELECTRICIAN
Trades
19
2.a Coordinate E-Stop Locations
Not Supplied by Belanger®
NA
2.b Electricians install conduits and wires
Trades & Electrical
19 & 20
3
ERECT FREESTYLER® FRAMEWORK
Frame and Carriage Assembly
4
4
RAISE CARRIAGE ONTO RAILS
Frame and Carriage Assembly
4
5
ERECT DRYER FRAME
Frame and Carriage Assembly
4
6
INSTALL BOOM MOUNT TO WALL
Frame and Carriage Assembly
4
7
INSTALL BOOM
Frame and Carriage Assembly
4
9
MEET WITH PLUMBER
Trades
19
9.a
Plan System Component drain system
NA
Including Air-Dump on compressor
NA
9.b
Plumber installs hard plumbing
NA
10
PLACE FLOOR ITEMS IN PROPER BAY LOCATION
10.a Install Entrance Photo Eye
Entrance and Exit Photo-Eyes
5
10.b Install Point of Entry System / POS in store
Not Supplied by Belanger®
NA
10.c Install Wait-Go / Navigational Signs
Frame and Carriage Assembly & Optional
Signage
4 & 16
10.d Undercarriage Wash
Undercarriage
12
10.e Install Treadle and Bug Spray Option (if applicable)
Treadle Assembly
6
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......