INSTALLATION AND STARTUP
2-2
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 2 Recommended Installation Sequence Checklist
Main Installation Checklist
Item
Installation Task
Chapter Name
Chapter and/or
Page Number(s)
ELECTRICIAN MOVES INSTALLATION TO BAY AREA
11
Electrical terminations made at MCC and SCC
Electrical & Initial Startup
20 & 22
12
Electrical terminations from Chemical Pumps to SCC
Chemical Delivery & MixStir® Options
7 & 8
13
Electrical terminations made at Pumping Station (Optional) HydroBlade® Assembly
14
14
Electrical terminations made at RO Unit
Spot Free Rinse (RO)
18
15
Electrical terminations made at Dryer Panel
Electrical & Initial Startup
20 & 22
16
Electrical terminations made at Dryer
Optional Onboard Dryer
17
17
Electrical terminations made at HMI (E-1063 Human Machine
Interface)
Electrical & Initial Startup
20 & 22
18
Electrical terminations made to Treadle
Treadle Assembly
6
29
Electrical terminations made at Photo Eyes
Entrance and Exit Photo-Eyes
5
20
Electrical terminations made at Entry Station / POS
Not Supplied by Belanger®
NA
21
Electrical terminations made at Navigational Signs
Frame and Carriage Assembly & Optional Signage
4 & 16
22
Electrical terminations made at ALL E-Stops
Not Supplied by Belanger®
NA
INSTALL SOFT PLUMBING
23
Install soft plumbing to Pumping Station (Optional)
HydroBlade® Assembly
14
24
Install soft plumbing to Chemical Pumps
Chemical Delivery & MixStir® Options
7 & 8
25
Install soft plumbing to Carriage
Frame and Carriage Assembly
4
26
Install soft plumbing to RO Unit
Spot Free Rinse (RO)
18
27
Install soft plumbing to Rocker Blaster / Undercarriage
Rocker Blaster, Rocker Spin Clean and
Undercarriage
12
PREP COMPONENTS
28
Enterlink™ / Hamilton Setups P.O.S.
Not Supplied by Belanger®
NA
29
Dryer adjustments
Optional Onboard Dryer & Initial Startup
17 & 22
30
Prep Water Softener
Water Softener
13
31
Prep RO Unit
Spot Free Rinse (RO)
18
Optional Items to be Installed Anytime
Item
Installation Task
Chapter Name
Chapter and/or
Page number(s)
Reclaim
Reclaim Water Option
9
Undercarriage, Undercarriage with Rust Inhibitor, Bug
Spray Applicator, Triple Foam, Drying Agent, CTA, Wheel
Blaster, RO, Dually Treadle
See Individual Component Manuals
NA
When Installation is Finalized
Item
Installation Task
Chapter Name
Chapter and/or
Page number(s)
32
Complete the Start Up Procedure
Initial Startup
22
33
Dryer Adjustments
Optional Onboard Dryer & Initial Startup
17 & 22
34
Run Test Vehicles with customer
Initial Startup
22
35
Customer Training on Operation
NA
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......