INSTALLATION AND STARTUP
4-2
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 4 Frame and Carriage Assembly
Floor Mounted Frame
Note:
Follow the torque specifications in Chapter 1 of this manual when tightening bolts.
Note:
It is imperative to wash quality and cycle time that leveling techniques at the end of
this chapter are performed.
Note:
See Chapter 17 for installation of Onboard Drying Applications.
Frame Rail Parts Identification (Overhead View)
1) Verify all the bay length, width, and height considerations highlighted in Chapter 3. Determine the
position of the machine and the centerline of the doors.
2) Determine if any of the arms need to be de-stroked.
Note:
The FreeStyler® uses a universal rail, so both rails are identical.
3) Place the two FreeStyler® rails in the bay considering the notes in the above diagram. If from the
height considerations, the carriage ca
n be placed onto the rails with the rail spacing set to 92 1/4’’,
then set rail spacing to that
distance at this time. If the rails need to be separated to 100’’ to lift the
carriage up in between the rails, set rail spacing to that distance at this time.
4) Take the four L-Bracket assemblies apart as shown below.
5) Take the sixteen compression rods and slide them into the larger diameter holes in the rails.
6) Attach the four L-Brackets to the frame using the 1/2-13 x 4-
1/2‘’ bolts, 1/2‘’ flat washers, bolt on
d
etail plate, and 1/2’’ Nylock™ nuts, as shown in the diagram below.
92-
1/4”
Proximity Target holes must
be at the exit end of the bay
Large holes always face out
Away from the center-line
Exit
Entrance
46-
1/8”
Machine
Centerline
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......