Installation
Guide Rails
4) After you have installed all of the Guide Rail sections, you can now install plastic sleeves. Start by
removing the Y-Sections from there lag bolts on each and set them aside.
5) Locat
e the two 30” (762mm) plastic sleeves and slide them all the way down to the exit end of the
Guide Rails as shown below.
6) Slide the 10-foot plastic sleeves on both Guide Rails until you get close to the entrance. Once
near the entrance, re-install the Y-Section as shown below.
7) Take a measurement from the last piece of plastic to the plastic already installed on the Y-
Sections. Cut plastic to fit and install it.
Measure here on both Rails
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......