Mounting procedure
1. Before mounting machine on the
tractor, first make sure there are no
people in the machine mounting zone.
2. Using power control lever, lower the
mounting down, pull tractor back and
hinge the machine to lower tie-rods.
Cotter pin the pins. Shut down the
diesel.
3. Shorten or elongate the upper tie-rod (1)
ant couple the hitch ball to the machine.
Secure the pin with cotter pin.
4. If necessary, set the upper tie-rod to
initial or required length.
5. If necessary, make lateral machine tilt
adjustment by means of right-hand
adjustable brace (2). To increase length
of the brace turn lever (3) clockwise,
and visa versa.
6. Before starting work check that:
•
Parts of the tractor were not in
dangerous proximity to machine
elements;
•
Central tie-rod didn’t touch PTO
fence with machine being in
lowermost position;
•
PTO universal-shaft drive was not
too long with large joints’ angles, and
there were not distance efforts
•
PTO fence didn’t touch the fence of
universal-shaft drive.
7. Slowly lift the machine and check that
clearances between tractor and
machine in lifted position were not less
than 100 mm.
8. Check if side swing of lower tie-rods is
sufficient and, if necessary, adjust it by
means of ties.