ECX 1U/2U INSTALLATION GUIDE
PX106483-EN REV A
Page 14 of 22
7. Cable routing
7.1. Securing a distribution cable to the internal strain relief
See below options for securing distribution cables.
Smaller diameter cables
Medium (or multiple) diameter cables
Larger diameter cables
7.2 Installing distribution cable for field termination
This section explains and shows different cable routing methods for the ECX 1U/2U.
A. Standard recommended procedure
1
Prepare the cable as follows: leave 25” (0,64 m) of sub-unit and 84” (2,13 m) of 900µm fiber.
2
Secure the end of the sub-unit cables to the intermediate strain relief by using the provided (4”) cable ties.
3
Loop and secure the distribution cable to the internal strain-relief.
! CAUTION:
Do not over-tighten the cable ties.
4
Route the 900µm fiber by using the management clips.
Distribution cable
Sub-unit: 25
” (0.64 m)
900µm fiber: 84
” (2.13 m)
1
2
3
4
5