3
Installation
System Installation and Initialization
Installation and initialization of the system require attention to the normal mechanical, power,
and thermal precautions for rack-mounted equipment.
The installation procedure for the system involves the following phases:
Note:
The rack mounting holes conform to the EIA-310 standard for 19-inch
racks. Take precautions to guarantee proper ventilation in order to maintain
good airflow at ambient temperature.
Note:
Unless otherwise specified, Grass Valley products are designed to
work in an environmentally controlled data center with low levels of gaseous
and dust (particulate) contamination.
The operation environment should meet severity level G1 as per ISA 71.04 for
gaseous contamination and ISO 14644-1 class 8 for cleanliness level.
Step
Procedure
See
1 Follow the safety warnings
Safety Warnings
2 Pay attention to the air flow consideration within the system and
rack
Air Flow
3 Make sure that none of the package contents is missing or
damaged
Package Contents
4 Mount the system into a rack enclosure
19” System Mounting
Options
5 Power on the system
Initial Power On
6 Perform system bring-up
System Bring-up
7 [Optional] FRU replacements
FRU Replacements