Installation MACH1000
Release 07 08/2022
37
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Checking the package contents
Installing an SFP transceiver (optional)
Wiring of the terminal blocks for supply voltage and signal contact
Installing and grounding the device
Operating the device
Connecting data cables
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 63
.
Check the individual parts for transport damage.
2.2
Installing an SFP transceiver (optional)
Prerequisites:
Exclusively use Hirschmann SFP transceivers.
See “Accessories” on page 63.
Figure 11: Installing SFP transceivers: Installation sequence
3
Summary of Contents for Hirschmann MACH1000 Series
Page 67: ...Installation MACH1000 Release 07 08 2022 67 ...
Page 68: ......