Installation MACH4002
Release 16 03/2021
39
2
Installation
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
Installing the device and grounding
Mounting the power supply unit on the back of the MACH4002 device
Mounting the power unit chassis, connecting with the MACH4002 device
Installing the M4-AIR... plug-in fan unit
Installing the plug-in power units in the M4-POWER power unit chassis
Installing an SFP transceiver (optional)
Wiring and installing the signal contact
Note:
Note the safety instructions in
“General safety instructions” on page 7
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 64
Check the individual parts for transport damage.
2.2
Installing the device and grounding
You have the option of assembling the device on a flat surface or in a 19"
standard switch cabinet.
2.2.1
Selecting the assembly location
CAUTION
OVERHEATING OF THE DEVICE
When installing the device, ensure that the ventilation slots are not covered.
Failure to follow these instructions can result in injury or equipment
damage.
Summary of Contents for Hirschmann MACH4002 Series
Page 71: ...Installation MACH4002 Release 16 03 2021 71 ...
Page 72: ......