Installation OCTOPUS OS20/OS24 Managed
Release 10 08/2017
25
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Wiring the connectors for supply voltage and signal contact
Installing and grounding the device
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 41
Check the individual parts for transport damage.
Summary of Contents for HIRSCHMANN OCTOPUS OS20 Series
Page 45: ...Installation OCTOPUS OS20 OS24 Managed Release 10 08 2017 45 ...
Page 46: ......