32
Installation RS20/22/30/32/40
Release 03 06/2013
2
Assembly and start-up
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Two or more devices configured with the same IP address can cause
unpredictable operation of your network.
The following steps should be performed to install and configure a device:
Unpacking and checking
Installing the SFP transceivers (optional)
Insert data in label area
Adjust DIP switch settings
Connect PoE power unit (optional)
Connect the terminal block for voltage supply and signal
contact and connect the supply voltage
Install the device on the DIN rail, grounding
Install the terminal block, start-up procedure
Connecting the data lines
2.1
Installing the device
2.1.1
Unpacking and checking
Check whether the contents of the package are complete
.
Check the individual parts for transport damage.
WARNING
UNINTENTIONAL OPERATION IN DEVICE
Install and maintain a process that assigns a unique IP address to every
device in the network.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Summary of Contents for Hirschmann RPS90/48V HV
Page 66: ......