4
Installation RSP20/25/30/35
Release 18 09/2021
Installing and grounding the device
2.3.1 Installing the device onto the DIN rail
2.3.2 Grounding the device
Installing an SFP transceiver (optional)
Connecting the terminal blocks
2.5.1 Supply voltage with the characteristic value K9
2.5.2 Supply voltage with the characteristic value KK
2.5.3 Supply voltage with the characteristic value CC
2.5.4 Supply voltage with the characteristic value TT
2.5.5 Signal contact
Operating the device
Connecting data cables
Filling out the inscription label
Making basic settings
Upgrading Software
Monitoring the ambient air temperature
Maintenance and service
Disassembly
Removing the device
Removing an SFP transceiver (optional)
Technical data
General technical data
Dimension drawings
EMC and immunity
Network range
Power consumption/power output
Scope of delivery, order numbers and accessories
Underlying technical standards
Further support
Summary of Contents for HIRSCHMANN RSP20
Page 70: ......