20
Installation SPIDER II
Release 07 10/2013
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following steps should be performed to install and configure a device:
Unpacking the package and checking the content
Installing an SFP transceiver (optional)
Connecting the terminal block for the supply voltage and the grounding
Mounting the device on the DIN rail
Installing the terminal block, start-up procedure
2.1
Unpacking the package and checking the
content
Check whether the package includes all items named in section
Check the individual parts for transport damage.
2.2
Installing an SFP transceiver (optional)
Before attaching an SFP or XFP transceiver, first remove the protective
cap of the SFP/XFP transceiver.
Push the SFP/XFP transceiver with the lock closed into the socket until it
latches audibly in place.
Figure 2: F/O SFP transceiver
Note:
Only use Hirschmann SFP transceivers.
See “Accessories” on
Summary of Contents for HIRSCHMANN SPIDER II
Page 33: ...Installation SPIDER II Release 07 10 2013 33 ...
Page 34: ...34 Installation SPIDER II Release 07 10 2013 ...
Page 36: ......