16
Installation
Example of Daisy-Chain Configuration
cable 1
cable 2
cable 3
Primary unit (BANK 00)
Secondary unit (BANK 01)
Secondary unit (BANK 02)
Secondary unit (BANK 03)
Getting Started:
Step 1:
Make sure that all servers, LCD Rack Console, and PRO3 KVM Switches
are powered off and that each PRO3 KVM Switch has been assigned a unique
BANK address.
Step 2:
Place all primary and secondary KVM switches in the desired location.