background image

MODEL: MT-NR1401
SIZE: 1380mmX1380mmX580mm

580mm

1380mm

1380mm

840mm

500mm

500mm

Drain hole

Cold

 

Hot

Install 2 water supply holes (one for cold 

and another for hot), 1 electrical outlet, 1 

drain hole (diameter

5cm) in advance. 

Do as the pic. shows:

840mm

1

Control Panel

2

Waterfall

3

          
Water Circulation

4

Cold Water Handle

5

Switch Handle

6

Hot Water Handle 

7

 Shower Head

8

Small Jets

9

Pillow

Volume Control

Big Water Jets

Light 

Air Jets

11

12

13

14

10

15

Drainer Switch

Drainer

04

03

Installation

rocess

 P

Preparations

1. Open the accessory box 1 as pic.
    Shows.

2. Remove the screw of inlet faucet. 

3. Put the inlet faucet into the 
    hole of the bathtub.

4. Put the rubber from below, and 
    use spanner to screw it.

5. Distinguish the water pipes of faucet.

6. Use spanner to screw the tie in.

Summary of Contents for MT-NR1401

Page 1: ...MT NR1401 Massage Bathtub Instructions of Installation and Use ...

Page 2: ...excess sports 3 The water temeperature should be below 45 during shower and the recommended temperature is 30 38 4 Don t take a bath for a long time Recommended time 15 21 5 All the information in this instruction are subject to change without prior notice 6 Settings configurations and details of the products are subject to be changed or upgraded without prior notice 7 For the maintenance please c...

Page 3: ...rculation 4 Cold Water Handle 5 Switch Handle 6 Hot Water Handle 7 Shower Head 8 Small Jets 9 Pillow Volume Control Big Water Jets Light Air Jets 11 12 13 14 10 15 Drainer Switch Drainer 04 03 Installation rocess P Preparations 1 Open the accessory box 1 as pic Shows 2 Remove the screw of inlet faucet 3 Put the inlet faucet into the hole of the bathtub 4 Put the rubber from below and use spanner t...

Page 4: ...ub then install downcomer 6 Use thread sealing tape to wrap around the drain hole 7 Make the thread sealing tape smooth 8 Fasten the drain tube 9 Put downcomer into the drain hole on the ground 11 Put plugs into the drain hole 10 Drain sewage of the tube then connect the cold and hot water pipe separately 12 Install pillow 06 05 Installation Process Installation rocess P ...

Page 5: ...ll automatically cut off the circuit if the current is too high 2 Volume control Unique Point 13 Seal the barthtub edge by silicon glue as follows 3 Waste water free piping system 08 07 Installation Process Installation rocess P ...

Page 6: ...es that provide full disconnection must be incorporated in the fixed wiring in accordance with the wiring rules 13 If the supply cord is damaged it must be replaced by the manufacturer its service agent or similarly qualified persons in order to avoid a hazard The installation should be carried out by a qualified technician and creepage protector Earthing Marking Equipotential Switch Marking 10 09...

Reviews: