Doc 0213860 rev L
Page 20 of 21
Not subject to issue control when printed
Testing - DELHI 60 / 70 / 80
Place the HI in test chamber as shown
Attach HI to the tube on 2cc coupler and place HI in the white jig/fixture.
The effective length of the tube for all models is 20mm
Use of test fixture is mandatory for all BTE during DSA6000 final HI testing. To use the fixture, place the HI in the fixture according
to pic. Place it in the test chamber as shown and select the correct test tpix and make sure to follow instructions coming up on the
screen. During the test programme execution the IAD calibration will be performed at the appropriate time. Another bennefit from the
fixture is that the HI is in a well defined position so the telecoil test can be performed without any interaction from the operator
20mm