Page 14
Page 15
BOILERMA
TE
2000
1.0 DESIGN
1.3 SYSTEM DETAILS
Any boiler used must be fitted with an overheat
thermostat i.e. it must be suitable for use in
a sealed system.
The F & E cistern must be fitted at a height
which will provide the minimum head required
for the boiler and must be at least 250mm
above the highest point of the system.
The height of the water level in the F & E cistern
from the base of the store should be no greater
than 10m.
A gravity check valve should be fitted in the
boiler return pipework to prevent gravity
circulation between the BoilerMate 2000 and
the boiler during dormant periods.
An automatic air vent will be required on the
flow adjacent to the boiler and depending
upon the pipe layout a manual air vent may
also be required on the return adjacent to
the boiler.
Boiler sited with dipped flow and return
pipes to the BoilerMate
Any boiler must be fitted with an overheat
thermostat i.e. it must be approved for use in
a sealed system.
An automatic air vent will be required on the
flow and return connections adjacent to the
boiler.
The height of the water level in the F & E cistern
must provide the minimum head required by
the boiler and must be at least 250mm higher
than the highest point of the system.
Boiler sited above the BoilerMate
Heating System
� � � �������
������� ����
������� ������
�� ����
������
����
����
���� ��������� ��� ����
���� ������� ����� �����
� � � �������
������� ����
������� ������
�� ����
������
����
����
���� ��������� ��� ����
Summary of Contents for Gledhill BoilerMate 2000 125
Page 8: ...Page 8 1 0 DESIGN 1 2 TECHNICAL DATA...
Page 33: ...Page 33 BOILERMATE 2000 3 0 SERVICING...
Page 42: ......
Page 43: ......
Page 44: ......