background image

Page 40

Page 41

BOILERMA

TE 

2000

1. 

 We  only  do  business  upon  the  Conditions  which  appear  below  and  no  other.    Unless  we  so  agree  in 

writing these Conditions shall apply in full to any supply of goods by us to the exclusion of any Conditions 
or terms sought to be imposed by any purchaser.  These Conditions of Sale and Warranty Terms override 
those  which  are  contained  on  the  Invoice  Forms  and  all  Sales  are  now  subject  to  these  Conditions  of 
Sale and Warranty terms only.

2.  PRICE

Orders  are  accepted  at  the  price  ruling  at  the  date  of  receipt  of  order,  this  price  is  our  last  published  list 
price plus a supplement to allow for any increase in the price of copper between the dates of publication of 
our price lists ("the copper price supplement").  An order may not be cancelled or varied after acceptance 
without  the  written  consent  of  the  company.    Such  cancellation  or  variation  shall  be  subject  to  such 
reasonable charges as may be appropriate.

3.  SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any 
additions  and  alterations  shall  be  the  subject  of  an  extra  charge.    Any  goods  not  so  specified  shall  be 
in  accordance  with  our  printed  literature  or  the  literature  of  any  of  our  component  suppliers  (subject 
to  any  modifications  made  since  publication).    If  we  adopt  any  changes  in  construction  or  design  of 
the  goods,  or  in  the  specification  printed  in  our  literature,  the  Purchaser  shall  accept  the  goods  so 
changed in fulfilment of the order.

4.  PAYMENT

The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due 
date we will allow a discount of 5% except where we have quoted a special net price.  If payment is not received 
in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)  payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 
(ii)  interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the 
base rate for the time being of Midland Bank plc.

5.  TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of 
any contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6.  DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to 
any place more than 25 miles from one of our manufacturing depots is subject to our quoted delivery charges.  
We reserve the right to make delivery of goods contained in one order by more than one consignment and at 
different times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the 
Purchaser shall take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled 
at  the  Purchaser's  risk  and  expense  to  store  the  goods  at  the  Purchaser's  premises  or  elsewhere  and  to 
demand payment as if they had been despatched.  Offloading at point of delivery shall be the responsibility 
of and be undertaken by the Purchaser.

7.  SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on 
the delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written 
notice of the damage, shortage or discrepancy so that we may prompt investigation.

8. RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of 
the Company and such return shall be subject to payment by the Purchaser of handling and re-stocking 
charges, transport and all other costs incurred by the Company.

 9. COMPANY LIABILITY

All  our  goods  are  made  of  the  best  materials  from  reputable  manufacturers  and  where  stated  are 
manufactured  to  the  appropriate  British  Standard.    Complaints  must  be  given  to  us  immediately,  before 
any  action  is  taken,  as  responsibility  cannot  be  accepted  if  repairs  or  renewals  are  attempted  on  site 
without our written authority.  

(1)  Domestic and Commercial Open Vented Cylinders and Tanks.
If  the  copper  cylinder  or  tank  or  any  integral  pipework  proves  to  be  defective  either  in  materials  or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the 
case of any obsolete product to any address in Great Britain.
(a)  free of all charge during the first year after delivery by us.
(b)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 
delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

AND  FURTHER

  we  will  meet  the  contractors/installers  reasonable  costs  in  removing  and  replacing  any 

defective Open Vented Copper Cylinder or Tank with defective integral pipework as follows:

Gledhill

 (Water Storage) 

Ltd

  

AMD. AUGUST 2000

Where  we  agree  to  rectify  any  defect,  we  reserve  the  right  to  undertake  the  work  on  our  own  premises.  
Provided that our product has been installed in accordance with any instructions for installation any any 
relevant codes of practice and in accordance with the bye-laws and requirements obtaining in any particular 
area we give the following warranties:

(i)  in the case of vessels of less than 80 imperial gallons capacity up to a maximum of one-half of the extent of 
our liability in regard to the replacement product expressed in (1) (a) and (b) above 
ii)  in the case of vessels larger than 79 imperial gallons capacity up to a maximum of one-quarter of the extent of 
our liability in regard to the replacement product as expressed in paragraphs (1) (a) and (b) above.

(2)   Domestic Mains Fed Products
 If the copper storage vessel itself or any integral pipework 
as part of the storage vessel assembly proves to be defective 
either in materials or workmanship, we reserve the right to 
either repair or supply replacements or the closest possible 
substitute  in  the  case  of  any  obsolete  product  and  will 
collect  and  deliver  to  any  address  in  England,  Wales  and 
Scotland (excluding all Scottish Islands).
(a)  free  of  all  charge  during  the  first  year  after  delivery 
by us.
(b) thereafter at a charge of one-fifth of the then current list 
price or any copper price supplement and delivery charge 
during the second year after delivery by us increasing by a 
further one-fifth on the second and subsequent anniversary 
of delivery by us.

AND  FURTHER 

we  will  meet  the  contractors/installers 

reasonable costs in removing and replacing any defective 
copper  storage  vessel  or  storage  vessel  with  defective 
integral pipework from the Domestic Mains Pressure Range 
of products up to a maximum of one-third of the extent of 
our liability in regard to the replacement product expressed 
in (2) (a) and (b) above.
(3)    Components  of  our  products  other  than  Storage 
Vessels and Integral Pipework.  We will either extend to the 
purchaser the same terms of warranty as we are given by the 
manufacturer  of  the  component  or  if  the  manufacturer 
does  not  give  any  warranty,  replace  free  of  charge  any 
component which becomes defective within twelve months 
after the date of the delivery by us and is returned to us at 
the purchaser's expense but we shall not meet the cost of 
removal or shipping or return of the component or any other 
cost charges or damages incurred by the purchaser.
(4)  In the case of the Gulfstream range of products any heat 
generator found to be defective and admitted to be such 
by us either as regards materials or workmanship within 12 
months  from  date  of  installation  or  18  months  from  date 
of  manufacture  whichever  is  the  sooner,  will  be  repaired 
or replaced at our option.

AND FURTHER

 we will meet the 

contractors/installers  reasonable  costs  in  removing  and 
replacing  any  defective  heat  generator  up  to  a  maximum 
of  one-third  of  the  extent  of  our  liability  in  regard  to  the 
replacement product.
(5)  In the case of goods manufactured solely in accordance 
with  our  specification  and  designs  and  in  respect  of  any 
installation work carried out by or on our behalf, our entire 
liability and the purchaser's sole remedies (subject to (1-4) 
above) and shall be as follows:
(a)  we  accept  liability  for  death  or  personal  injury  to  the 
extent  that  it  results  from  our  negligence  that  of  our 
employees agents or subcontractors.
(b)  subject  to  paragraph  (d)  below,  we  accept  liability  for 
direct physical damage to tangible property to the extent 
that such damage is caused by our negligence that of our 
employees agents or subcontractors.
(c) our total liability to the purchaser over and above any 
liability to replace under (1 - 4) above (whether in contract 
or in tort including negligence) in respect of any one cause 
of loss or damage claimed to result from any breach of our 
obligations  hereunder,  shall  be  limited  to  actual  money 
damages which shall not exceed £20,000 provided that such 
monetary limit shall not apply to any liability on the part of 
ourselves referred to in paragraph (a) above.
(d) except as provided in paragraph (a) above but otherwise 
notwithstanding any provision herein contained in no event 
shall we be liable for the following loss 
or damage howsoever caused and even if foreseeable by us 
or in our contemplation :-
(i) economic loss which shall include loss of profits, business 
revenue, goodwill or anticipated savings.
(ii) damages in respect of special indirect or consequential 
loss  or  damage  (other  than  death,  personal  injury  and 
damage to tangible property).
(iii)  any  claim  made  against  the  purchaser  by  any  other 
party
(save as expressly provided in paragraph (b) above).
(e) except in respect of our liability referred to in paragraph 
(a) above no claim may be made or action brought (whether 
in contract or in tort inluding negligence) by the purchaser in 
respect of any goods supplied by us more than one year after 
the date of the invoice for the relevant goods.

Summary of Contents for Gledhill BoilerMate 2000 125

Page 1: ...MAINS PRESSURE HOT WATER SUPPLY SYSTEM INCORPORATING A THERMAL STORE ALL MODELS COMPLY WITH THE WATER HEATER MANUFACTURERS SPECIFICATION FOR INTEGRATED THERMAL STORES BOILERMATE 2000 BOILERMATE 2000 G...

Page 2: ...ity System audited by BSI Patents Pending TheGledhillGroup sfirstpriorityistogivea high quality service to our customers Quality is built into every Gledhill product and we hope you get satisfactory s...

Page 3: ...BoilerMate 2000 is not covered by section G3 of the current Building Regulations and is therefore not notifiable to Building Control The information in this manual is provided to assist generally in...

Page 4: ...The outlet temperature of the domestic hot water is maintained by a printed circuit board which controls the speed of the pump circulating the primary water from the store through the plate heat exch...

Page 5: ...e d o M 5 2 1 M B 5 4 1 M B 5 8 1 M B 0 1 2 M B 5 2 2 M B y t p m e t h g i e W g k 8 5 g k 1 6 g k 5 6 g k 6 7 g k 8 8 l l u f t h g i e W g k 3 7 1 g k 6 8 1 g k 5 1 2 g k 6 4 2 g k 8 7 2 p m u P W...

Page 6: ...ion cistern complete with ballvalve overflow fitting and cold feed open vent pipework assembly is supplied separately Optional Equipment A soft water model is available for areas where the hardness le...

Page 7: ...O I S N E M I D E C N A I L P P A l e d o M t h g i e H h t d i W h t p e D A B C 5 2 1 M B m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 4 1 M B m m 0 4 1 1 m m 5 9 5 m m 5 9 5 5 8 1 M B m m 0 5 3 1 m m 5 9 5 m...

Page 8: ...Page 8 1 0 DESIGN 1 2 TECHNICAL DATA...

Page 9: ...BOILERMATE 2000 1 2 TECHNICAL DATA AWAITING HOT WATER PERFORMANCE GRAPHS FOR EACH MODEL SIZE PERFORMANCE GRAPHS OF GRUNDFOS PUMPS 1 0 DESIGN GRUNDFOS 15 50 litres sec 6 litres sec GRUNDFOS 15 60 TO BE...

Page 10: ...optional extra are being used or if all taps are provided with flow regulators the flow regulator on the cold inlet should be removed No check valve or similar device should be fitted on the cold wat...

Page 11: ...ed fully in accordance with their recommendations This is particularly important in relation to use of push fit connections when using the optional flexible hose kits see 2 2 Installation Pipework con...

Page 12: ...vity circulation does not occur when the heating pump is not running To be certain of preventing this it is recommended that a check valve or valves are fitted on the vertical flow pipes Thewaterlevel...

Page 13: ...ework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic heating systems by the manufacturer and is installed fully in accordance with th...

Page 14: ...erMate 2000 and the boiler during dormant periods An automatic air vent will be required on the flow adjacent to the boiler and depending upon the pipe layout a manual air vent may also be required on...

Page 15: ...lockshield valves on the radiators If this is not done the performance of the BoilerMate will be adversely affected If heating of a single bathroom radiator or towel rail is required in summer then it...

Page 16: ...e system that has been installed If the primary pipework dips or the boiler is located above the BoilerMate a single F E cistern with a cold feed and open vent piped to the cistern should be used This...

Page 17: ...heating modes In the former only hot water pump and electric heating element are energized In the latter the heating system pump is also energized This means that the heating will be on permanently u...

Page 18: ...mperatures will normally be higher than in a conventional system and the design of the cupboard and door will need to take this into account No ventilationisnormallyrequiredtothecupboard A suitable lo...

Page 19: ...ecommended method is shown opposite Before installation the site requirements should be checked and confirmed as acceptable The plastic cover and protective wrapping should be removed from the applian...

Page 20: ...on fittings Connection E is blanked 15mm copper pipe Connection J is RC1 2 1 2 in BSPT internal A Safety open vent B Cold feed expansion C Primary flow from boiler D Primary return to boiler E Towel r...

Page 21: ...F E cistern and pipework site run by the installer to connect this to the appliance Obviously any pipework in the roof space and the feed and expansion cistern will need to be adequately insulated to...

Page 22: ...age 22 WIRING DIAGRAM STANDARD BOILERMATE 2000 APPLIANCE 2 0 INSTALLATION 2 2 INSTALLATION Y E K L B E U L B R B N W O R B Y G W O L L E Y N E E R G R D E R K L B K C A L B Y W O L L E Y H W E T I H W...

Page 23: ...from an earthing strap on the primary return to boiler pipe to the earth stud on the wiring panel 2 0 INSTALLATION Make the connections as shown opposite on the terminal strip provided The appliance...

Page 24: ...Frost Protection When frost protection is required for the whole house or where a base temperature is required during cold weather then a frost thermostat should be wired across plug in terminals 21 a...

Page 25: ...Page 25 BOILERMATE 2000 2 0 INSTALLATION 2 2 INSTALLATION WIRING DIAGRAM BOILERMATE2000 WITH SWITCH...

Page 26: ...e service slot provided in the base of appliance The recommendations contained under Electrical Connection Standard Appliance should be followed when connecting a remote clock room thermostat boiler e...

Page 27: ...n Check the water level in the feed and expansion cistern and adjust the ballvalve if necessary Check the whole of the primary heating and domestic hot and cold distribution systems for leaks It is es...

Page 28: ...MAXIMUM 2 Switch off heating on the clock programmer and room thermostat 3 Switch off hot water on the programmer if 2 channel clock is fitted 4 Check the jumper settings are correct These must all be...

Page 29: ...heating pump will run continuously This product is covered by the Benchmark scheme and a separate commissioning service log book is included with this product This must be completed during commissioni...

Page 30: ...T use a BoilerMate on a sealed primary i e closed system 13 DON T use pipe smaller than 28mm between the boiler and the BoilerMate when the boiler rating exceeds 20kW about 68 000 Btu h 14 DON T use d...

Page 31: ...ts specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 01253 474401 However allcomponentsarereadilyaccessible and can be changed quickly and easily by...

Page 32: ...a l P p e w S 7 1 0 T G 4 6 6 5 0 E 0 1 B C A d r a o b l o r t n o c e c n a i l p p A k o l E 5 5 2 B X 8 5 1 9 3 E 1 1 r o s n e s e r o t S k o l E 9 4 1 T G 2 2 0 6 2 E 2 1 r o s n e s n r u t e...

Page 33: ...Page 33 BOILERMATE 2000 3 0 SERVICING...

Page 34: ...at the space heating and hot water load is not greater than the boiler output and that the BoilerMate 2000 model is suitable for the type of dwelling If all the above checks are satisfactory then it i...

Page 35: ...tric backup this should be switched on and operated in accordance with the instructions on the label fitted to the appliance until the installer manufacturer can attend When requesting a visit from th...

Page 36: ...s as in Option 4 for Taps Mixers APPENDIX A WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or ext...

Page 37: ...d close to the appliance if required 0 5 0 P I M e d o C k c o t S 1 e p y t d l o f i n a M m o o r k a o l c e n o m o o r r e w o h s e t i u s n e e n o m o o r h t a b e n o r o t a l u g e r w o...

Page 38: ...ework in table 2 r e p p o c m m 5 1 n i h t g n e l e p i p t n e l a v i u q e m u m i x a M 1 e l b a T e r u s s e r p t e l n I r a b m e p i p f o h t n e l t n e l a v i u q e m u m i x a M m l...

Page 39: ...al connection of fittings to the manifold will need to suit the arrangements shown on page 35 Note 1 If it is proposed to fit chemical water treatment such as a water softener this should be fitted in...

Page 40: ...he contractors installers reasonable costs in removing and replacing any defective Open Vented Copper Cylinder or Tank with defective integral pipework as follows Gledhill Water Storage Ltd AMD AUGUST...

Page 41: ...ses owned or occupied by the Purchaser or in the possession of the Purchaser for the purposes of repossessing and recovering any such goods the property in which has remained in us under paragraph 2 a...

Page 42: ......

Page 43: ......

Page 44: ......

Reviews: