Testing and measuring
36
Follow the instructions on the UNIMET
®
300ST display:
During the PE conductor test, the low-resistance continuity of the PE conductor
is tested with a high current (> 2 A). This produces heat energy.
If the PE conductor test is repeated very often and without breaks during manual
testing or single tests, the test system will prevent overheating by aborting the
test. A message will appear:
After the test is terminated, testing the PE conductor is permitted again within a
few seconds.
** Note **
Connect DUT to
Unimet a. switch on!
Start:
1. Connect device under test
then start test
2. Carry out
and evaluate
visual inspection
passed
Start the electrical tests
VISUAL INSP. ERROR
Continue test
anyway?
Cancel:ESC Next:
not passed
The test results
are evaluated
3. If visual inspection
not passed:
decide whether
the test should
proceed anyway
VISUAL INSPECTION
1. Passed
2. Failed
R-PE
Value: 0.004
Ω
Limit: 0.300
Ω
- - - Measuring - - -
ESC
ESC
ESC
**Danger**
Test will be stopped
Transformer overheat
(Measur. Time > 2 min)
Summary of Contents for UNIMET 300ST
Page 50: ...Testing and measuring 50 TGH1365en 10 2012...
Page 58: ...Data 58 TGH1365en 10 2012...
Page 61: ......