89000109-002
xVue Touch Installation Manual
Rev 2
Page 9-7
© Honeywell International Inc. Do not copy without express permission of Honeywell.
For Use in Non-Certified Aircraft
KG 71EXP ADHARS
A general visual inspection of the KG 71EXP
ADHARS and the associated wiring and Pitot
and Static lines must be performed during
each annual inspection. Visually check
wiring for general condition, routing,
chafing, bonding straps and/or wires and
integrity of clamping and stand-offs.
Visually check the mechanical installation
for condition, including checking the unit
and all mounting brackets for security.
Loose and chafing brackets will increase the
resistance between parts. Check for signs
that the units have not been tampered with
or removed. Inspect and verify the bonding
straps or ground wires are in good
condition, and are not loose or chafing.
Connection points to the units and to the
airframe must be inspected for evidence of
corrosion.
If any of these indications are present, an
electrical bonding test must be performed.
Within the preceding 24 calendar months,
each static pressure system, each altimeter
instrument, and each automatic pressure
altitude reporting system has been tested
and inspected and found to comply with
Appendices E and F of 14 CFR Part 43.
12 months
24 months
Connectors
Check for general condition, and integrity of
the attachment hardware.
12 months
Circuit breakers
Check for general condition and operation.
12 months
Switches
Check for general condition and operation.
12 months
Associated wiring
Check for general condition, routing,
chafing, and integrity of clamping and
stand-offs, and shields.
12 months
Table 9-1 ICA Inspection Criteria
xVue Touch System
Component Description
Inspection Requirement
Recommended Minimum
Inspection Interval
Completed