PL-6K Series of Parking Lifts
40
P/N 5900056 — Rev. D — October 2021
⚠
WARNING
Most of the required wiring must be provided by a licensed, certified Electrician; it is
not
supplied with the Lift. All control wiring must be a
minimum
of #16 AWG; note
that local codes may require heavier gauge. BendPak recommends encasing all
wiring to protect it from the outdoor elements and anchoring it so that it stays in
place.
The wiring for the Controls requires:
•
Control Box to Junction Box
: 5 or 6 wires, depending on model. PL-6KDT/X requires 5 wires,
PL-6KT requires 6 wires. The wires are: one per button (Key, Up, Down) and one wire per
Platform.
•
Power Unit to Junction Box
: 3 or 4 wires, depending on Power Unit; see
and the drawing on the previous page for details.
•
Solenoids to Junction Box
: 2 wires per each Solenoid.
⚠
DANGER
The following procedure
must
be performed by a certified, licensed Electrician in
accordance with local and national electrical codes.
To connect the Controls
:
1.
Mount the Junction box on the Powerside end of the Front Beam using four Pan Head Screws
M6 x 25 (5530318) and four M6 Nuts (5535112).
2.
At the Control Box, connect the wiring per the drawings in
3.
Route the Control Box wires through the back of the Control Box into the Control Post, then up
and out through a hole at the top of the Control Post.
4.
Connect the Control Box to the Control Post using four Pan Head Screws M6 x 16 mm (5530791).
5.
Run the Control Box wires along the Powerside Crossbeam and then into the Junction Box.
Encase and secure the wires.
6.
Route the wires from the Electrical Box to the Junction box. Encase and secure the wires.
7.
At each Solenoid, connect the wiring per drawings in the
8.
Route the wires from each Solenoid to the Junction box. Encase and secure the wires.
9.
At the Junction Box, connect the wiring coming from the Control Box, from the Power Unit, and
from the Solenoids per the drawings in the
Summary of Contents for PL-6KDT
Page 61: ...PL 6K Series of Parking Lifts 61 P N 5900056 Rev D October 2021 Labels ...
Page 62: ...PL 6K Series of Parking Lifts 62 P N 5900056 Rev D October 2021 ...
Page 63: ...PL 6K Series of Parking Lifts 63 P N 5900056 Rev D October 2021 ...
Page 64: ...PL 6K Series of Parking Lifts 64 P N 5900056 Rev D October 2021 Parts Drawings ...
Page 66: ...PL 6K Series of Parking Lifts 66 P N 5900056 Rev D October 2021 ...
Page 67: ...PL 6K Series of Parking Lifts 67 P N 5900056 Rev D October 2021 ...
Page 69: ...PL 6K Series of Parking Lifts 69 P N 5900056 Rev D October 2021 ...
Page 71: ...PL 6K Series of Parking Lifts 71 P N 5900056 Rev D October 2021 ...
Page 72: ...PL 6K Series of Parking Lifts 72 P N 5900056 Rev D October 2021 ...
Page 73: ...PL 6K Series of Parking Lifts 73 P N 5900056 Rev D October 2021 ...
Page 75: ...PL 6K Series of Parking Lifts 75 P N 5900056 Rev D October 2021 ...
Page 76: ...PL 6K Series of Parking Lifts 76 P N 5900056 Rev D October 2021 ...
Page 77: ...PL 6K Series of Parking Lifts 77 P N 5900056 Rev D October 2021 ...
Page 78: ...PL 6K Series of Parking Lifts 78 P N 5900056 Rev D October 2021 ...
Page 79: ...PL 6K Series of Parking Lifts 79 P N 5900056 Rev D October 2021 ...
Page 80: ...PL 6K Series of Parking Lifts 80 P N 5900056 Rev D October 2021 Maintenance Log ...
Page 81: ...PL 6K Series of Parking Lifts 81 P N 5900056 Rev D October 2021 Maintenance Log ...
Page 82: ...PL 6K Series of Parking Lifts 82 P N 5900056 Rev D October 2021 Maintenance Log ...