XPR-10 Series Two-Post Lifts
22
P/N 5900951 — Rev. D — May 2019
The following procedure puts the two Equalizing Cables into place at the bottom of the Post;
it is not a
full install of the Equalizing Cables
.
To put the Equalizing Cables into position
:
1.
Put both Posts either flat on the ground or mostly on the ground with their tops elevated on a
sawhorse or similar.
The
insides
of the Posts need to be accessible, facing up.
2.
Slide the Lift Heads away from the bottoms of both Posts by at least 24 inches / 610 mm, to give
yourself some space to work.
Not necessarily to scale. Not all components shown. Top view looking at inside of Post. Equalizing
Cables not yet in place.
Summary of Contents for XPR-10 Series
Page 9: ...XPR 10 Series Two Post Lifts 9 P N 5900951 Rev D May 2019 Specifications ...
Page 77: ...XPR 10 Series Two Post Lifts 77 P N 5900951 Rev D May 2019 Labels ...
Page 78: ...XPR 10 Series Two Post Lifts 78 P N 5900951 Rev D May 2019 ...
Page 79: ...XPR 10 Series Two Post Lifts 79 P N 5900951 Rev D May 2019 ...
Page 81: ...XPR 10 Series Two Post Lifts 81 P N 5900951 Rev D May 2019 ...
Page 82: ...XPR 10 Series Two Post Lifts 82 P N 5900951 Rev D May 2019 ...
Page 83: ...XPR 10 Series Two Post Lifts 83 P N 5900951 Rev D May 2019 ...
Page 84: ...XPR 10 Series Two Post Lifts 84 P N 5900951 Rev D May 2019 ...
Page 85: ...XPR 10 Series Two Post Lifts 85 P N 5900951 Rev D May 2019 ...
Page 86: ...XPR 10 Series Two Post Lifts 86 P N 5900951 Rev D May 2019 ...
Page 87: ...XPR 10 Series Two Post Lifts 87 P N 5900951 Rev D May 2019 ...
Page 88: ...XPR 10 Series Two Post Lifts 88 P N 5900951 Rev D May 2019 ...
Page 91: ...XPR 10 Series Two Post Lifts 91 P N 5900951 Rev D May 2019 Maintenance Log ...