3.
Look at the inside of the Lift Head you just moved, from the bottom looking towards the top — it
looks something like the following drawing.
Drawing is not to scale. Not all components shown. View is from under bottom of Lift Head looking
towards top of Lift Head. Both Posts look the same from this viewpoint.
4.
Remove the Post Sheave from the bottom of the Post whose Lift Head you just moved up.
Keep the Post Sheave, the pin, and the bolt nearby; you will be re-installing them soon.
5.
Find the two Equalizing Cables.
For Symmetric models, both Equalizing Cables are the same length, so it does not matter which
one you install first.
For Asymmetric models, the Equalizing Cables are different lengths. You must route the longer
Equalizing Cable over the Overhead Assembly Sheaves closer to the Approach side of the Lift.
Important
: The lengths of each Equalizing Cable are shown on a tag attached to the cable. If the
tags have fallen off, lay the cables out to determine which is longer. The difference may
be only a few inches. However, if you mix them up, the Lift will not work correctly and
you will have to remove them and then re-install them correctly.
Summary of Contents for XPR-10 Series
Page 9: ...XPR 10 Series Two Post Lifts 9 P N 5900951 Rev D May 2019 Specifications ...
Page 77: ...XPR 10 Series Two Post Lifts 77 P N 5900951 Rev D May 2019 Labels ...
Page 78: ...XPR 10 Series Two Post Lifts 78 P N 5900951 Rev D May 2019 ...
Page 79: ...XPR 10 Series Two Post Lifts 79 P N 5900951 Rev D May 2019 ...
Page 81: ...XPR 10 Series Two Post Lifts 81 P N 5900951 Rev D May 2019 ...
Page 82: ...XPR 10 Series Two Post Lifts 82 P N 5900951 Rev D May 2019 ...
Page 83: ...XPR 10 Series Two Post Lifts 83 P N 5900951 Rev D May 2019 ...
Page 84: ...XPR 10 Series Two Post Lifts 84 P N 5900951 Rev D May 2019 ...
Page 85: ...XPR 10 Series Two Post Lifts 85 P N 5900951 Rev D May 2019 ...
Page 86: ...XPR 10 Series Two Post Lifts 86 P N 5900951 Rev D May 2019 ...
Page 87: ...XPR 10 Series Two Post Lifts 87 P N 5900951 Rev D May 2019 ...
Page 88: ...XPR 10 Series Two Post Lifts 88 P N 5900951 Rev D May 2019 ...
Page 91: ...XPR 10 Series Two Post Lifts 91 P N 5900951 Rev D May 2019 Maintenance Log ...