10
Fig 3.5
For Narrow
confi guration,
lock cable
button into fi rst
button position
into Lock Plate
inside of car-
riage
NOTE: Portions of Carriage and Post cut away for clarity
NOTE: Second Cable Button should be tucked away from
the lifting cable route. Second Cable Button in Fig 3.5
shown for representational purposes only.
Threaded
end of cable
routed down
through
carriage
towards
opposite
post
NOTE: Post hidden for clarity
OPTIONAL SHEAVE COVER
INSTALLATION INSTRUCTIONS
To install optional sheave covers, place sheave cover on
sheave bracket so that the bracket return faces towards
the sheave and align pin holes and bolt holes. The cut-
out in the bracket for the cable must be facing towards
the base plate. Insert pin through sheave cover, sheave
bracket, and sheave. Align pin bolt hole with sheave
cover bolt hole and sheave bracket bolt hole and insert
M6 hex head bolt and tighten.
Sheave
Sheave
Bracket
Sheave
Cover
Sheave
Pin
Hex Head
Bolt
Fig 3.6
SITE LAYOUT / FLOOR PLAN
A
Model
Configuration
A
Capacity
XPR-9D
Narrow
3342 mm / 132”
9,000 LBS
XPR-9D
Wide
3672 mm / 145”
9,000 LBS