17
4. Insert the threaded end of the cable through the hole
on top of the carriage. Place M18 washer and M18 Nylock
nut on threaded cable end. Tighten cable nuts until taut,
checking that both cables have equal tension.
(See Fig 10.4)
XPR-9D Equalizer
Cable Routing
Fig 10.3
From
base
plate
sheave
To lift
head
carriage
NOTE: Post cut away for clarity
Threaded cable
end comes down
from Top Plate
sheave and into
hole on top of car-
riage plate.
Threaded
Cable End
Nylock
Nut
Fig. 10.4
NOTE: Post cut away for clarity
WARNING !
THE EQUALIZER CABLE SHEAVES WILL NEED TO
BE REMOVED TO EASE THE ROUTING OF THE
EQUALIZER CABLES. BE SURE TO REINSTALL ALL
PINS, COVERS AND CLIPS OR SERIOUS DAMAGE
OR INJURY MAY OCCUR.
WARNING!
WHEN THE CABLE ADJUSTING NUTS BOTTOM OUT ON
THE THREADED END OF THE CABLE CONNECTOR AND
THERE IS STILL SLACK IN THE CABLES, THE CABLES
HAVE STRETCHED BEYOND THE SAFE USEFUL LENGTH
AND NEED TO BE REPLACED WITH FACTORY APPROVED
CABLE ASSEMBLIES. DO NOT PLACE WASHERS, SPACERS
OR OTHER DEVICES TO “SHORTEN” THE EFFECTIVE
CABLE LENGTH AS DAMAGE TO THE LIFT OR INJURY TO
PERSONS MAY OCCUR.