5 - 82
FLYWHEEL INSTALLATION
STARTING
Installation:
proceed in the opposite order to removal.
Assemble:
•
the nut (5) Fig. A
•
the washer (6) Fig. A.
Tighten the nut (5) to the following torque.
T.R.
Torque 90 N*m
Assemble:
• the
fl ywheel magnet cover
•
gasket (7)
NOTE:_________________________________
When closing the magnet fl ywheel cover Fig. B pay atten-
tion to the gasket.
If the gasket is damaged, it must be replaced with a new
one.
Assemble:
•
the screws (3) Fig. C
to the following torque:
T.R.
Torque 12 N*m
A
C
3
B
COPY - Moto GB - Grant Martland - grantmartland@motogb.co.uk
Summary of Contents for TRK 502
Page 6: ...1 1 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 19: ...2 2 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 37: ...3 1 3 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 40: ...3 4 NOTES COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 95: ...4 1 4 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 254: ...5 1 5 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 345: ...6 1 6 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 360: ...ELE 16 7 COPY Moto GB Grant Martland grantmartland motogb co uk ...