14
Bentone
165 205 33
3. General instructions
3.1 General rules
The installation of an oil burner should be carried out in accordance with
local regulations. The installer of the burner must therefore be aware of all
regulations relating to oil and combustion.
Only oil suitable for the burner should be used and then in combination with
a suitable oil filter before the oil pump of the burner.
If the burner is replacing an existing burner make sure that the oil filter
is replaced or cleaned. The installation must only be undertaken by
experienced personnel. Care should be taken by the installer to ensure
that no electrical cables or fuel/gas pipes are trapped or damaged during
installation or service/maintenance.
3.1.1 Installation and maintenance instructions
The maintenance instructions supplied with the burner must be kept at an
easily accessible location in the boiler room.
3.1.2 Instructions
The user must be receive detailed instructions concerning the functionality
of the oil burner and entire system. It is the responsibility of the supplier to
provide the user with instructions.
3.1.3 Inspection and maintenance
The boiler/burner should be examined regularly for any signs of malfunction
or oil leakage. (See service schedule)
3.1.4 Start up
In order to obtain the correct setting, a flue gas analysis and temperature
measurement must be carried out. Otherwise, there is a risk of soot build
up, poor efficiency or condensation precipitation in the chimney. The system
must be fine-tuned at start-up. The temperature in the chimney must be at
least 60 °C at 0.5 m down in the chimney to prevent condensation.