14
Bentone
172 525 13 2020-10-08
4.5 Skeleton diagram CPi
1.
Ball valve
2. Filter
3. Governor
4.
Pressure gauge with shut-off cock
5a.
Gas pressure switch, mini
5b.
Gas pressure switch, maxi
6a.
Main valve
6b.
Safety valve
1)
7.
Valve proving system
9.
Air pressure switch
10.
Electrical connection
11.
Solenoid V3
Pos. 5b, 7: Components not required according to EN 676.
1)
Required over 1200 kW according to EN 676.
Summary of Contents for STG 120/2
Page 17: ...17 Bentone 4 9 Gas nozzle Inner assembly Natural LPG Natural gas LPG 2 5 8...
Page 35: ...35 Bentone 172 615 76 2020 10 16 2 9 1 Wiring diagram Gas burner control LME21...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...