3
Bentone
Table of contents
1. General Information __________________________________ 4
2. Technical Data _______________________________________ 7
2.1 Output range _____________________________________ 8
2.2 Description STG 120 _____________________________ 11
3. General instructions _________________________________ 12
3.1 General instructions ______________________________ 12
3.2 Installation and maintenance instructions ____________ 12
3.3 Instructions _____________________________________ 12
3.4 Inspection and maintenance _______________________ 12
3.5 Start up ________________________________________ 12
3.6 Commissioning of installation ______________________ 12
4. Installation _________________________________________ 13
4.1 Delivery check ___________________________________ 13
4.2 Preparations for installation ________________________ 13
4.3 Gas supply ______________________________________ 13
4.4 Electric connection _______________________________ 13
4.5 Skeleton diagram CPi _____________________________ 14
4.6 Mounting on the boiler ____________________________ 15
4.7 Installation example ______________________________ 15
4.8 Inspection of gas nozzle before commissioning _______ 16
4.9 Gas nozzle ______________________________________ 17
5. MULTI-BLOC, _______________________________________ 18
5.1 Overview _______________________________________ 18
5.2 Mounting closed position indicator (CPi) _____________ 19
5.3 Adjustment of governor ___________________________ 20
5.4 Adjustment of start gas flow valve V3 ________________ 20
5.5 Flow adjustment main valve V2 _____________________ 20
5.6 Skeleton diagrams _______________________________ 21
6. Setting the burner ___________________________________ 23
6.1 Setting the air pressure switch _____________________ 26
6.2 Setting the min. gas pressure switch ________________ 27
6.3 Recommended excess air when using default setting __ 28
6.4 Determining the gas quantity for the system __________ 28
6.5 Calculating the quantity of gas supplied _____________ 30
6.6 Flame monitoring and ionisation current check ________ 31
6.8 UV-Detector _____________________________________ 32
7. Handing over of the installation _______________________ 33
8. Fault location, functional troubles _____________________ 33
9. Electric equipment __________________________________ 34
9.1 Wiring diagram __________________________________ 35
9.2 Control program when disruption; __________________ 37
10. Troubleshooting __________________________________ 39
11. General instructions for gasburners _________________ 42
Summary of Contents for STG 120/2
Page 17: ...17 Bentone 4 9 Gas nozzle Inner assembly Natural LPG Natural gas LPG 2 5 8...
Page 35: ...35 Bentone 172 615 76 2020 10 16 2 9 1 Wiring diagram Gas burner control LME21...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...