27
Bentone
172 615 90-2
!
When servicing/replacing components that aff ect combustion,
fl ue gas analysis and soot test shall be carried out on the
installation.
8.3
Combustion device
1.
Disconnect the main power and shut off the fuel supply.
2.
Remove gas line by loosening the electrical cabling and screws (G) to
the gas valve and lift out.
3.
Loosen screws (H) and lift burner out of fi xing fl ange.
4.
Loosen screws (I) and remove fl ame tube.
5.
Clean brake plate and nozzle if necessary.
6.
Check electrodes, replace if necessary! (See chapter ”Gas nozzle” for
setting electrodes).
7.
Fit the fl ame tube and attach the burner to the fi xing fl ange.
8.
Install gas line and check for leaks.
9.
Turn on the main power and open the fuel supply.
10. Start burner and check/adjust combustion.
!
Before obtaining access to electrical and fuel line components
all supply circuits must be disconnected.
!
Check for leaks in the gas line.
G
160303-510
H
I
160303-512