70
Installation
6002782_b – 14.09.2016
3.
Installation
3.1
Safety information for installation
D
WARNING!
Hazard through disregard of the installation instructions.
This chapter contains important information for the safe
installation of the device.
☞
Read through this chapter carefully before installing the
device.
☞
Follow the safety instructions.
☞
Carry out the installation as described.
y
Installation only by qualified specialist personnel.
D
“1.2 Authorised target groups” (page 64).
y
Electrical work only to be undertaken by qualified
electricians.
D
“1.2 Authorised target groups” (page 64).
y
At least three persons are required for the installation.
y
When working at heights, ensure good stable footing
(e.g. stable stepladder).
y
The hob and other parts that can be touched must be
allowed to cool prior to installation.
y
Store the film or other parts of the packaging in a location
which is inaccessible to children.
y
The device must be in an undamaged and fault-free
condition prior to installation.
y
Cables must not be kinked, crushed or damaged.
y
Never open the fan housing.
y
The power supply voltage must match the voltage
information quoted on the ratings plate.
D
“2.6 Technical data” (page 68).
y
Ensure that the power supply is stable and remains so
prior to the installation.
Connect the power supply only when instructed to do so
in the installation instructions.
3.2
Requirements for the installation location
D
WARNING!
Risk of death due to improper installation.
Disregard of the ambient conditions can lead to hazardous
situations, e.g. in the handling of electrical power or gas.
☞
Make sure that the requirements for the installation
location are complied with.
y
Do not install in potentially explosive atmospheres.
y
In extracted air mode and whilst using a heating point
which uses air from the room as its oxygen supply
(e.g. chimney):
y
A safety device is absolutely essential.
y
The safety device (e.g. under-pressure monitor P4,
inspected in accordance with DIN 18841:2005-12 TÜV
and in accordance with DVGW-VP121) must prevent
gases being drawing to the room.
y
An approval for commissioning (e.g. from a
chimneysweep) must be available.
y
Installation is only permitted on structural building
elements capable of bearing the load (solid structure).
y
If it is necessary to break through the wall:
A wall break-through influences the structural integrity of
the building. There is a danger of collapse. This work must
only be carried out by a specialist.
y
If installed above a fireplace that uses solid fuels (e.g. coal
stove):
The fireplace must have a sealed cover which cannot be
removed. Otherwise there is a fire risk due to flying sparks.
Applicable legal and country-specific regulations must be
observed.
y
The air flowing out must be able to dissipate unimpeded.
Do not impede the air flow, e.g. through the installation of
objects on or above the device.
y
Make sure that the building electrical supply is properly
earthed.
y
The power supply voltage present must match the
voltage information quoted on the ratings plate.
y
An all-pole isolating device (with a contact gap of at least
3 mm) must be provided for the power supply on the
installation side.
y
There must be a means of connecting the ceiling console
to the power in the installation area.
A second means of connection is required for the variants
with an integrated ceiling effect light.
Country-specific, legal provisions must be observed.