72
Installation
6002782_b – 14.09.2016
☞
Assemble the tools and materials required:
y
Stable stepladder
y
Folding rule or measuring tape
y
Pencil
y
Spirit level
y
Phillips screwdriver PH1, PH2
y
ø 8 mm masonry bit
y
Hammer drill
y
13 mm spanner
y
Allen key SW 2.5 mm
y
Protective material (e.g. thick cardboard) for the hob
and the worktops
☞
Keep the installation area free of objects that could be in
the way or that could be damaged.
☞
Make sure that the hob and other parts that could be
touched have cooled down.
☞
Protect the hob and other surfaces in the installation area
(e.g. with thick cardboard).
☞
Ensure that the power supply is switched off and remains
so. Connect the power supply only when instructed to do
so in the installation instructions.
3.5.2
3.5.3
Unpack the device
D
ATTENTION!
Hazard of glass breaking or other damage due to
incorrect handling.
The device and its surfaces can be damaged when being
unpacked or transported.
☞
Do not cut into the protective cardboard packaging.
☞
Keep objects that could scratch the device far away from
it (e.g. tools, belt buckles).
☞
Unpack the device and all accompanying parts carefully.
☞
Set the device down on a firm, clean and protective
surface (e.g. thick cardboard).
☞
Check the device and its constituent parts for damage.
☞
Check the delivery is complete.
D
“2.5 Scope of delivery” (page 68).
If parts are missing or damaged:
☞
Please consult your dealer or customer services.
☞
Remove the packaging material.
D
“8.1 Dispose of packaging” (page 90).
3.5.4
Install the ceiling mounting plate
The device is designed to be hung on ceilings.
When mounting to a solid ceiling:
☞
Make sure that the ceiling has sufficient load bearing
capacity.
☞
Ensure that the ceiling is level and horizontal.
☞
Use the fastening materials provided.
With different installation situations:
☞
Enquire about alternative fastening systems (e.g. consult
with your architect).
☞
Only use fastening hardware suitable for the type of
ceiling.
When hanging, first attach the ceiling mounting plate to
the ceiling and then screw the hood body onto the ceiling
mounting plate.
=
=
a
=
=
b
c
BDL
95
SK
,
BDL
95
SKE
,
BDL
95
SKE-L
BDL
115
SK
,
BDL
115
SKE
,
BDL
115
SKE-L
BDL
135
SKE
BDL
180
SKE
a Gap between two
bolt anchors
721
mm
1021
mm
1183
mm
1602
mm
b Gap between two
bolt anchors
270
mm
200
mm
200
mm
270
mm
c Diameter of circle
over slots
770
mm
1040
mm
1200
mm
1625
mm
☞
Determine the hanging position. Observe the hob
position:
y
The ceiling mounting plate’s centre point is directly
above the hob’s centre point.
y
The ceiling mounting plate runs parallel to the hob.
Summary of Contents for BDL 115 SK
Page 92: ...6002782_b 14 09 2016 ...