Preparation for installation
Installation instructions
37
Preparation for installation
In this chapter you will learn what the prerequisites are
for installation. Perform all the steps in this guide one
after the other.
Ø
Make sure that all the safety instructions from the
chapters "General Safety Instructions" and "Safety
Instructions for the Installer" are followed.
WARNING
Risk of injury from falling parts with
improper fastening or too low bearing
capacity of the cabinet.
Ø
Ensure that the cabinet has sufficient
bearing capacity.
Do not attempt to carry out the
installation where the required
bearing capacity cannot be assured.
Ø
Only use suitable fastening
materials.
The supplied fastening material is
only to be used for fastening into a
stable cabinet (e.g. 16 mm wooden
sheets). If there are other installation
conditions, you can ask your
architect for example, about
alternative fastening methods before
installation.
Ø
Ensure that the device is correctly
suspended.
Ø
Ensure that the power supply meets the voltage
supply specified on the ratings plate.
Ø
Ensure that the connection to the power supply is
made after the device is installed.
Ø
Make sure that the device can be disconnected on
all poles from the electricity supply after
installation.
Qualifications of personnel
Two persons are required to mechanically install the
device.
These technicians must have sufficient craftsman skills
and knowledge.
The required specialist skills include:
§
Knowledge of the regulations on safety at work
§
Ability to read technical drawings
§
Experienced in using electrical and mechanical
tools
§
Knowledge of fastening systems
§
Basic knowledge of ventilation systems
§
It would be ideal to have several years experience
in installing extraction hoods and further additional
qualifications, like an apprenticeship as a carpenter
for example.
Persons without this specialist knowledge must be
trained by an experienced technician in the installation.
Prerequisites for the mechanical end
assembly
The required prerequisites for the installation include:
§
The cabinet is has sufficient bearing capacity.
§
The socket for the power supply is to be provided
on-site, installed by a qualified electrician.
§
For the BLB 60 FLE and BLB 90 FLE:
The external fan is fitted.
The cable to control the external fan is laid on-site
to the installation position.
§
For exhausted air and hybrid operation:
The connection cables for the wall boxes and/or
window contact switches are laid on-site to the
installation position.
§
For exhausted air and hybrid operation:
The exhaust pipe is laid on-site to the installation
location.