7
Product information
6004067_a – 01.08.2018
EN
2.5
Scope of delivery
A
B
C
D
F
E
A Upper trim frame with water drip bowl
B Hood body with extraction unit, fan box and connection
cable, 1.5 m
C Phillips head screws 3.5 x 20 mm
D Sealing strip
E Mains cable with plug and cold device plug
F Operating and installation instructions
The fastening material is only suitable for fastening to
wooden work tops. With different installation situations
(e.g. granite work tops) it is necessary to clarify the means of
fastening.
Further accessories may be required depending on the
operating mode.
D
Observe the separate documentation for the hob.
2.6
Installation dimensions
The fan box is pre-assembled in accordance with the order.
The precise installation dimensions are dependent on the
mounting position.
For the precise dimensions of the product, refer to the
order documents.
All variants
1000
1106
0 - 495
162
138
88
110
382
616
760 - 940
1068
Variants with fan box on the front - side view
132
32
87
760 - 940
203
365
Summary of Contents for Moveline BTH 100 ML
Page 35: ...35 6004067_a 01 08 2018 EN ...
Page 36: ...6004067_a 01 08 2018 ...